HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Seeking help with Yokogawa CentumVP

2016-12-24View Original

Thread Content

The system consists of 60–64 stations in total; the flowcharts for the four operation stations HIS60–63 all use 64 as a shortcut. Why don’t diagrams 60–63 change after modifying the 64-station flowchart load?
Reply #22016-12-28
Although a shortcut is used, each station should be LOADed once
Reply #32016-12-28
Load the screen separately for each operation station
Reply #42017-01-02
You can right-click at 64 and select LOAD----DOWNLOAD TO HIS. In this way, whenever there is a change at the engineer station, the operation station also changes.
Reply #52017-01-03
For other stations, when shortcut icons are used, after modifying the flowchart for 64, it is necessary to download the corresponding flowchart from HIS0164 under SYSTEM VIEW; once that is done, all other stations will have it as well.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.