HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to deal with leaks in the air-cooling tube bundle of a recovery tower

2016-12-30View Original

Thread Content

There is a leak at the plug of the air-cooling tube bundle in the recovery tower of our unit’s aromatic extraction plant; negative pressure cannot be maintained, and it’s possible that the weld has failed. I would like to ask everyone for advice on how to deal with this issue
Reply #22016-12-30
Remove the tube bundle; after replacement is approved, carry out welding repairs. Replace the tube bundle during major repairs. :lol
Reply #32017-01-07
It’s blocked, the pipe bundle is blocked. There is no valve for air cooling, so it cannot be shut off.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.