HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why are isolation balls added to the pipes during nitrogen drying operations?

2023-08-07View Original

Thread Content

During nitrogen drying operations, the workers should be located upwind of the nitrogen injection pipeline; forced ventilation should be provided in the area where the connections are made, and isolation balls should be placed inside the pipeline
Reply #22023-08-07
It is convenient for isolation, sealing, and removal; however, its pressure-bearing capacity is limited, and it is also used in emergency repairs.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.