HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pipeline plan view symbol issues

2017-05-14View Original

Thread Content

Are the symbols for valves or flanges in the pipe plan the same as those used in the axonometric view? Are the symbols for auxiliary components such as valves in the plan views and axonometric views different from those in the axonometric views?
Reply #22017-05-15
The representation of valves and flanges in plan views and axonometric views should be consistent, as there is a separate sheet provided when producing the drawings, which outlines the legend for that set of drawings

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.