Elevated installation of sewage pipelines for chemical industry projects

2018-08-17View Original

Thread Content

I don’t know which colleague said that **current policies and regulations require that waste pipes be installed above ground. I reviewed the codes for chemical process pipelines, water supply and drainage design, as well as wastewater treatment design, but found no explicit regulations in any of them. The buried construction method is specified in the GB 50268-2008 Code for Construction of Water Supply and Drainage Pipelines. GB50014-2006 only requires open drainage channels. Which hero can shed some light on this?
Reply #22018-09-18
In principle, it is to prevent soil contamination caused by issues such as ruptured sewage pipes or leaks. It’s just that no valid basis can be found as to which regulation or design standard it is.
Reply #32018-09-18
In my opinion, this post should be posted in the section on pipeline valves or environmental wastewater treatment, where more professional responses can be obtained; it shouldn’t be posted in the pump section

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.