A brief analysis of steam traps and the renovation of pipeline drain stations

2018-12-11View Original

Thread Content

This post was last edited by 955559 on 2018-12-11 22:22. In steam systems, there is always some heat loss in the steam pipes, which causes the steam to condense along the length of the main pipes. If this condensate is not removed, it will accumulate inside the pipes, leading to phenomena such as water hammer and erosion. Not only will the steam pipes sink ; Pipe wall rupture can also occur when the water hammer speed is too high or the amount of condensation is large. 1. For larger-diameter steam main lines, a significant amount of condensate is generated after the system is started up; therefore, it is recommended to install drain stations every 30–50 meters, placing them at the lowest points. 2. When installing drain stations, it is necessary to ensure that condensate can reach the drain valves. Because, due to gravity, the condensate will flow along the slope of the pipe toward the lower point. 3. During normal operation, steam flows along the main pipe, carrying the condensate with it. The small-diameter hydrophobic pipes are connected directly to the bottom of the main pipe. Although the flow rate of these small-diameter pipes is sufficient, it is not possible to collect a large amount of condensate flowing along the steam main pipe. The diameter of the collection pipe should be the same as that of the steam pipe (although larger-diameter steam transport pipes may have a different diameter), and a blind flange should be installed at the bottom of the collection pipe for cleaning purposes. 4. It is recommended that the drain valve for hydrophobic pipes be installed at a distance of around 100–150 mm above the blind flange; this allows for effective drainage while also preventing debris from clogging the valve.
Reply #22018-12-11
Technical exchange area; please do not bring any advertisements.
Reply #32018-12-12
Additional point 1: The main steam pipe usually has a compensation pipe, and the steam trap should be installed at the first bend of this compensation pipe (in the direction of steam flow).
Reply #42018-12-12
It would be better if a sketch could be attached

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.