HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Can non-destructive testing of pressure pipelines be carried out while the pipeline is still in place?

2019-01-31View Original

Thread Content

As the title suggests, I have a question: during a comprehensive inspection of pressure pipelines, when conducting tests such as thickness measurement, RT, and UT, is it possible to carry out these tests with the pipeline still filled with fluid or gas, without emptying it first? Is that correct? Based on what standard?
Reply #22019-02-01
The gas medium should have no impact; there is always material present when making openings under pressure
Reply #32019-02-01
What about the liquid? Does temperature also have an impact?
Reply #42019-02-01
The liquid has an impact, but X-rays can also be taken

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.