HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pressure pipeline registration

2019-08-01View Original

Thread Content

Dear experts, is it necessary to have design documents when registering a newly installed pressure pipeline? Thank you~~
Reply #22019-08-02
This is necessary; **the regulations require it.** If even the design institute does not approve it, how can the registration authority grant registration?
Reply #32019-08-21
Registration for newly installed pipelines requires an installation inspection report
Reply #42019-08-22
It’s definitely necessary, and it’s best to have as-built drawings. You can check the registration requirements in the guidelines provided by the Market Regulation Bureau; even for pipelines that were built without proper documentation in the past, registration still requires obtaining design drawings from a design firm.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.