Can the gasoline pipelines in a chemical plant be laid directly underground?

2026-01-06View Original

Thread Content

The two medium pipelines are carbon steel pipes filled with gasoline; they run within the refined oil tank area, from the storage and transportation tanks to the vehicle loading pier, passing through vehicle roads and fire roads. The operating temperature of the pipeline is 30°C, the design temperature is 65°C, the operating pressure is 0.1–0.5 MPaG, the design pressure is 1.0 MPaG, and the external insulation thickness is 50 mm. It will likely take about 20 meters of laying. The questions are as follows: 1. Can these 2 pipelines be buried directly in the ground? What are the relevant standards for implementation? 1. If it cannot be laid directly underground, is it possible to use a trench? What are the precautions?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.