HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Please have the budget expert take a look

2021-06-15View Original

Thread Content

What do these numbers in the red box mean?
Reply #22021-06-15
This post was last edited by bulusli on 2022-4-27 at 15:04. The image is from HG20238, \"Estimate Quotas for Chemical Engineering Construction\". Those who need pipeline stress analysis can contact a Class A design institute, which can provide calculation reports. wei r1600843384
Reply #32021-06-15
The unit for the fixed unit price is incorrect; it should be “yuan” instead of “piece”.
Reply #42021-06-16
All units within the red box must be rounded up using the round-up method; this represents the average usage amount.
Reply #52021-06-16
It shouldn’t be a yuan; all the tables in the entire specification use the unit ‘ a’
Reply #62021-06-16
Got it. It’s the average usage:handshake:handshake
Reply #72021-06-18
I’ve been studying it; recently I’ve been learning the basics of cost estimation.
Reply #82021-06-21
It should be the average amount of main materials required for installing every 10 meters of pipeline

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.