Staffing for sulfuric acid plant

2017-08-12View Original

Thread Content

What are the differences in the required staffing levels for acid production using various raw materials on different scales? Such as 300,000 tons, 600,000 tons, 800,000 tons, 1 million tons?
Reply #22017-08-14
The larger the acid production facility, the higher its degree of automation tends to be, resulting in fewer employees. Additionally, the process of producing sulfuric acid is relatively short, allowing for fewer employees.
Reply #32017-08-14
It’s not necessarily the case; for large-scale pyrite processing, the volume of raw materials and waste materials to be handled is significant, so a relatively larger number of staff are required; Some small pyrite raw material processing units do not operate on a three-shift system; instead, there is only one shift responsible for the processing
Reply #42017-09-06
Our plant requires only 7 people per shift to produce acid from 100,000 tons of flue gas
Reply #52017-09-07
Old unit: 3 sulfuric acid production lines, 8 people: lol

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.