95. How to activate the cooler? What issues should be noted?

2021-12-14View Original

Thread Content

95. How to activate the cooler? What issues should be noted?
Reply #22021-12-14
Open the cold medium exhaust valve – open the cold medium inlet valve – (after exhausting) close the exhaust valve, open the cold medium outlet valve – open the hot medium outlet drain valve – open the hot medium inlet valve – (after exhausting) close the exhaust valve, open the hot medium outlet valve – check for leaks
Reply #32021-12-14
So it should have been that the cooler passed the pressure test from the start: lol
Reply #42021-12-14
So what counts as the standard?
Reply #52021-12-14
This post was last edited by Zhongyuanren on 2021-12-14 at 11:44. Activation steps: 1. Empty the device’s memory before activation. 2. First, start the cold flow by opening the cooling water inlet valve; at the same time, open the cooling water outlet drain valve to release air, then close the drain valve. Once the tank is filled with water, slowly open the cold flow outlet valve. 3. Re-apply heat flow: Open the heat inlet valve and the outlet drain valve to remove air from the equipment, then close the drain valve and open the outlet valve. Please check the following: 1. Check for leaks in the floating head, cover, flanges, etc. 2. Check for internal leakage in the tube and shell sides
Reply #62021-12-14
This post was last edited by xlxuiin on 2021-12-14 at 12:27. First of all, pressure testing must be carried out after maintenance to check its quality. However, maintenance (opening, cleaning, sealing leaks, removing tube bundles, etc.) is not carried out every time before restarting operation; it is also possible that other issues are addressed first, and then the system is brought back online. So pressure testing is not a necessary part of the answer to your question. The issues primarily relate to the contents of operating procedures (procedures), and do not involve the contents of maintenance procedures.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.