This post was last edited by hesonchang214 on 2017-5-9 23:30. Reward for participation: 2 Wealth. Correct reward: 6 units of wealth for a certain earthwork project. The construction contract stipulates that there is no advance payment for the project; payments are made on a monthly basis. A retention amount is deducted each month, starting from the first month, at a rate of 5% of the monthly payment amount. The minimum amount required for the supervision engineer to issue a monthly payment certificate is 250,000 yuan. As confirmed by the supervision engineer’s measurement, the construction unit completed 230,000 yuan worth of work in the first month and 420,000 yuan worth of work in the second month. Therefore, the amount indicated on the actual payment certificate issued by the supervision engineer for the second month is ( ) ten thousand yuan. A. 25.00 B. 39.90 C. 42.00 D. 61.75 Answer: D
For a certain earthwork project, the construction contract stipulated that there would be no advance payment; payments for progress would be settled on a monthly basis. A retention amount would be deducted on a monthly basis, starting from the first month, at a rate of 5% of the payments for progress. The minimum amount required for the supervision engineer to issue a monthly payment certificate was 250,000 yuan. As confirmed by the supervision engineer’s measurement, the construction unit completed 230,000 yuan worth of work in the first month and 420,000 yuan worth of work in the second month. Therefore, the amount indicated on the actual payment certificate issued by the supervision engineer for the second month is (D) thousand yuan. A. 25.00 B. 39.90 C. 42.00 D. 61.75