HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

On the parallel operation of transformers

2017-10-17View Original

Thread Content

This post was last edited by chizhi on 2017-10-18 at 18:36. The two transformers located on the 10KV Section 1 and Section 2 need to be operated in parallel on the 400V side; should we take into account the operating mode at the 10KV level? In other words, do we need to change the 10KV operation from segmented mode to a mode where it operates through Section 1 and the busbar?
Reply #22017-10-24
It is necessary to change the operation mode of 10KV from segmented operation to single-phase and bus coupling operation
Reply #32017-10-24
What’s the reason? Is it fear of backflow?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.