The formwork measurement for cup-shaped foundations includes the following () tasks. A: After the base cushion is prepared, small wooden stakes are placed at positions around the foundation pit. Using a plumb line and a plumb bob, the alignment lines for the column bases are marked on the cushion; ink lines are drawn, and red paint is used to make marks, which serve as a guide for setting up the formwork for the column bases and arranging the foundation rebar.
B: When setting up the formwork, align the bottom edge of the formwork with the alignment lines on the cushion, and use a plumb bob to check whether the formwork is vertical.
C: The designed elevation of the top surface of the column base is marked on the inner wall of the formwork, serving as a reference for the height at which concrete should be poured.
D: The actual elevation of the top surface of the corbels and the column tops should match the designed elevation.
E: The allowable deviation for the verticality of the column shaft is ±5 mm when the column height is ≤5 m.
Answer: ABC
Reply #22018-11-05
A: After the base cushion is prepared, small wooden stakes are placed at positions around the foundation pit. Using a plumb line and weight, the alignment lines for the column bases are projected onto the cushion; ink lines are drawn, and marks are made with red paint to serve as a guide for setting up the formwork for the column bases and arranging the foundation rebar. B: When setting up the formwork, align the bottom edge of the formwork with the alignment lines on the cushion, and use a plumb line to check whether the formwork is vertical. C: The designed elevation of the top surface of the column base is marked on the inner wall of the formwork, serving as a reference for the height at which the concrete should be poured

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.