2018-03-13View Original

Thread Content

The general order of removing templates is (  ).   a. Remove the parts that were installed first before removing those installed later; remove the parts installed later before those installed first. b. Remove the parts installed later before removing those installed first. c. Remove the non-load-bearing parts first, then the load-bearing parts. d. Remove the load-bearing parts first, then the non-load-bearing parts. e. Start from the bottom up, and from the inside out. Answer: bc
Reply #22018-03-13
The general order of removing templates is ( bc ).   a. Remove the parts that were installed first before removing those that were installed later b. Remove the parts that were installed later before removing those that were installed first c. Remove the non-load-bearing parts first, then the load-bearing parts d. Remove the load-bearing parts first, then the non-load-bearing parts e. Start from the bottom up, and from the inside out
Reply #32018-03-13
c. Remove the non-load-bearing parts first, then the load-bearing parts

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.