HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Discussion on the setup and management of tier 3 boxes

2018-04-20View Original

Thread Content

Configuration of the three-level distribution boxes at the construction site: Each distribution box is equipped with a single leakage protection switch, with a threshold of 30 mA or 15 mA, and a response time of 0.1 seconds. If the distribution box is equipped with plug outlets, it should be locked for management ; If there is no plug and the cable exits, the distribution box does not need to be locked. Secondary distribution boxes must be locked for management.
Reply #22018-04-23
I think tertiary cabinets should all be managed with padlocks; sometimes there is more than one load in a tertiary cabinet as well

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.