Which of the following statements regarding the basic rules for drawing construction drawings is incorrect? ( ) A. The general steps for drawing architectural construction drawings are: floor plan → elevation → section → details. B. The general steps for drawing structural construction drawings are: foundation floor plan → foundation details → structural layout plan → structural details. C. In a structural layout plan, solid lines are used to represent the outlines of components that are visible or cut through, while dashed lines are used for those components that are not visible; door and window openings also need to be drawn. D. In a structural layout plan, reinforcement bars of different sizes should also be indicated. E. Architectural elevations are drawn by determining the length of the elevation from the floor plan, and the height of the elevation as well as the corresponding positions of various elements from the section views. Answer: CD 【Explanation】The general steps for drawing architectural construction drawings are: floor plan → elevation → section → details ; The general steps for drawing structural construction drawings are: foundation plan → foundation details → structural layout plan → structural details. The architectural elevation should derive the length of the elevation from the plan, and measure the height of the elevation as well as the corresponding positions of various elements from the section. In the structural plan, solid lines are used to represent the outlines of components that are cut through or visible, while dashed lines are used for the outlines of components that are not visible. Door and window openings are generally not depicted. In the structural plan, distribution bars do not need to be drawn. For slabs with the same reinforcement, it is sufficient to draw the reinforcement details of just one of them.
Reply #22018-06-18
B. The general steps for drawing structural construction drawings are: foundation plan → foundation details → structural layout plan → structural details
Reply #32018-06-18
C. In the structural plan, solid lines are used to represent the outlines of components that are visible or cut through, while dashed lines are used for those components that are not visible; door and window openings also need to be drawn. D. In the structural plan, distribution bars of different sizes should also be shown

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.