HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Utilities – Water Supply and Drainage Section] 20181004

2018-10-04View Original

Thread Content

When a water tower is installed at the starting point of the pipeline network, the diameter of the water supply pipe from the pump station to the water tower is calculated based on the water supply volume of the pump station’s corresponding operating stage. a、Maximum level b、Minimum level c、Water flow rate from the pump station to the water tower d、None of the above Answer: a. In a pipe network equipped with a pre-net water tower, the diameter of the water conveyance pipe from the pump station to the water tower should be determined based on the maximum water supply capacity of the pump station.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.