HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Utilities – Water Supply and Drainage Section] 20181103

2018-11-03View Original

Thread Content

In a water supply system, the design flow rate of the pipes that deliver water to the distribution network should be ( ). a、Maximum primary water supply capacity of the secondary pumping station b、Maximum daily peak water consumption c、Maximum water supply capacity of the secondary pumping station d、Maximum water supply capacity of the secondary pumping station plus fire protection flow rate Answer: c
Reply #22018-11-03
a、Maximum primary water supply capacity of the secondary pumping station
Reply #32018-11-03
c. Maximum water supply capacity of the secondary pumping station
Reply #42018-11-03
a、Maximum primary water supply capacity of the secondary pumping station

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.