【Daily Question】Utilities - Mechanical & Electrical - 20191023

2019-10-23View Original

Thread Content

This post was last edited by hesonchang214 on 2019-10-25 at 20:32. For the acceptance of the foundation for the equipment, the foundation that requires preloading must meet certain requirements ( ), and there must be records of the preloading settlement; otherwise, the foundation acceptance and equipment installation shall not proceed.    A. The contractor carries out preloading in accordance with the methods specified in the design. B. The contractor carries out preloading in accordance with the methods specified by the testing unit. C. The testing unit carries out preloading in accordance with the methods specified in the design. D. The supervision unit carries out preloading in accordance with the methods specified in the design. Answer: A
Reply #22019-10-23
A. The contractor carries out preloading in accordance with the methods specified in the design

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.