HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utility Engineering – Water Supply and Drainage – 20191026

2019-10-26View Original

Thread Content

When water supply pipes are installed concealed, the following requirements shall be met; among them, which item is incorrect? A. It can be directly laid within the structural layers of the building. B. Main pipes and vertical pipes should be laid in ceilings, pipe shafts, or pipe galleries; branch pipes are preferably laid in the finishing layer of the floor or along the walls in pipe grooves. C. The outer diameter of water supply branch pipes laid in the finishing layer or pipe grooves should not exceed 2.5 mm. D. For water supply pipes laid in the finishing layer or pipe grooves, plastic materials, metal-plastic composite pipes, or corrosion-resistant metal pipes are suitable. Answer: A is the correct answer. Options B, C, and D respectively comply with the provisions of Paragraph 2 of Article 3.5.18, Paragraph 2 of Article 3.5.18, and Paragraph 4 of Article 3.5.18 of the current “Code for Design of Building Water Supply and Drainage Systems”; Option A does not comply with the provisions of Paragraph 1 of Article 3.5.18 of the same code.
Reply #22019-10-26
A. It can be directly laid within the building’s structural layer 
Reply #32019-10-26
A. It can be directly laid within the building’s structural layer 

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.