HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Explanation of the startup process for EDI components

2020-02-04View Original

Thread Content

  1. Turn on the power supply of the EDI system, that is, turn off the EDI shutdown switch.   2. First, start the EDI feed water pump, and slowly turn open the pure water inlet control valve V5, the outlet control valve V6, and the concentrated water make-up control valve V7. Open all the concentrated electrode water discharge valves, and open and adjust the exhaust valve V0.   3. Monitor the conductivity of the water entering the ultra-pure water EDI system; if it exceeds the set value, the water is automatically discharged. Once the water quality meets the standards, the water inlet valve opens while the drain valve closes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.