HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The ultra-pure water equipment manufacturing company explains to you what to do in case of drainage problems with the equipment

2020-02-26View Original

Thread Content

This post was last edited by hesonchang214 on 2020-2-27 at 11:37. 1. At this point, it is necessary to carefully check whether the high-pressure pump of the ultrapure water system has a pressure loss issue.   2. If neither wastewater nor pure water is discharged, or only very little wastewater is discharged, it’s possible that the pre-filter is clogged.   3. If only wastewater is discharged and no pure water is discharged, then the check valve is blocked.   4. It could be caused by a malfunctioning solenoid valve, which prevents effective activation.   5. Check whether the reverse osmosis membrane is clogged.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.