This post was last edited by hesonchang214 on 2020-6-13 at 16:32. Which of the following statements regarding the installation requirements for thermal pipelines is incorrect? A. Thermal pipelines are usually installed either overhead or in trenches. B. An anti-moisture layer is required outside the insulation layer of overhead thermal pipelines. C. When compensators for thermal pipelines are installed vertically, if the medium is hot water, a vent valve should be installed at the highest point. D. Fixed supports should be installed between two compensators and on both sides of each compensator (i.e., on the far side). Answer: B
Reply #22020-06-10
D. Fixed supports should be installed between the two compensators and on both sides of each compensator (referring to the far side)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.