Thread Content
As an important supporting project for CNPC’s Dalian Petrochemical relocation initiative, the Dalian (Xizhongdao) Crude Oil Commercial Reserve Facility project commenced construction in May this year. The newly built storage area is equipped with 9 crude oil tank groups, of which 8 are 150,000 cubic meter tank groups and 1 is a 100,000 cubic meter tank group. Each tank group is equipped with 4 storage tanks, for a total of 36 crude oil tanks with a capacity of 5.2 million cubic meters. The reservoir area is divided into a production zone, an auxiliary production zone, an administrative management zone, and a dedicated fire station. Among them, the production area includes oil tank areas, 1 oil transfer pump room, 1 metering room, 2 charging rooms for inspection robots, and 5 production auxiliary buildings. Auxiliary production area: includes 1 accident tank with a capacity of 145,000 cubic meters, 1 accident tank with a capacity of 5,000 cubic meters, 1 initial rainwater tank with a capacity of 3,000 cubic meters, 1 rainwater monitoring tank with a capacity of 7,000 cubic meters, 1 fire fountain room, 2 fire water tanks with a capacity of 10,000 cubic meters each, a laboratory, a 10kV power distribution station and 1 low-voltage substation, as well as 1 comprehensive equipment room. Administrative area: Composed of a comprehensive office building and a garage. Specialized fire station: It consists of a fire service complex, a training tower, and training grounds.
【Ten Years of Rapid Development in Chemical Engineering Equipment】2692-2025: China’s first pilot project for using microorganisms to convert carbon dioxide into feed protein has achieved successful trial production https://bbs.hcbbs.com/thread-5701661-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2693 to 2025: Researchers at Dalian Institute of Chemical Physics developed the first prototypical hydrogen anion battery https://bbs.hcbbs.com/thread-5701676-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first hydrogen-ammonia dual-fuel gas turbine was successfully produced in the Yuanbaoshan Industrial Park in Chifeng, Inner Mongolia, from 2695 to 2025. https://bbs.hcbbs.com/thread-5701680-1-1.html (Source: Haichuan Chemical Industry Forum)
【HaiChuan Safety Discussion】What are the useful applications of AI robots in chemical plants that merit development? https://bbs.hcbbs.com/thread-5701773-1-1.html (Source: HaiChuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】International Leadership in Revolutionary Technologies for Dehydration through Coupled Reactions of Solid Materials 2698-2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】The project under the key research and development program 2699-2025, titled “Research on Key Equipment for the Production, Storage, Transportation, and Refueling of Liquid Hydrogen sowie Related Safety Aspects,” has successfully passed the comprehensive performance evaluation. https://bbs.hcbbs.com/thread-5701769-1-1.html (Source: Haichuan Chemical Industry Forum)