HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - Civil Engineering - 20210216

2021-02-16View Original

Thread Content

Multiple choice: The construction procedures for brick walls include ( ). A: Leveling the ground; B: Setting out lines; C: Installing height markers; D: Hanging plumb lines; E: Laying bricks. Feel free to participate actively in the discussions – there are great rewards available for those who answer questions from VIP members! ! !
Reply #22021-02-16
A, B, C, D, E Explanation: Bricklaying work usually includes procedures such as leveling the surface, marking lines, setting up brick samples, installing gauge stakes, drawing reference lines, applying mortar, and actually laying the bricks. If it is a clean wall, joint sealing is also required.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.