HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Discussion of the Day] Utility Engineering – Civil Construction – 20210302

2021-03-02View Original

Thread Content

During the ( ) phase, BIM engineers will, in accordance with the requirements of the client, conduct a thorough and detailed analysis of the design documents and drawings submitted by the design department, and formulate specific, quantified design strategies for each discipline. A. Preliminary design B. Detailed design C. Structural design D. Construction drawing design phase. Feel free to participate actively in the discussions; the system offers generous rewards for answering questions from VIP members! ! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.