HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Utilities - Civil Engineering - 20210402

2021-04-02View Original

Thread Content

The height of one level of a scaffold is generally ( ). Choose one: A. 0.6m B. 1.2m C. 1.8m D. 0.9m Answer: B. Feel free to participate actively in the discussions; the system offers generous rewards for answering questions from VIP members! ! !
Reply #22021-04-02
The height of each level of a construction scaffold is generally 1.80 m; the first row can reach 2.0 m, while the top level can be adjusted according to the height of the building (but must not exceed 1.80 m).
Reply #32021-04-02
B. 1.2m Analysis: For the external scaffolding used in wall construction, the height of each tier is called the ‘step distance’. Section 6, ‘Structural Requirements’, of JBJ130-2001 \"Safety Technical Specifications for Fastened Steel Tubular Scaffolds in Building Construction\" specifies two step distances: 1.20–1.35 m and 1.80 m. 1.20-1.35 meters allows for flexible adjustment according to different ceiling heights ; 1.80 meters, specifically for exterior wall painting.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.