Is it possible to have doors on the fire wall between Class C vehicle areas and the adjacent Class A areas, where there is a 5% gap?

2022-04-15View Original

Thread Content

For Class C vehicle spaces: “Is it possible to install doors on the fire wall between two Class A areas where the distance is less than 5%?” The interpretation of clause 3.1.2 of the Building Code states that fire and explosion prevention separation measures should be used to \"completely separate\" Class A production areas from other areas. Question: 1. What are fire and explosion prevention separation measures? The blast wall should be included; should the floor slabs be included as well? 2. Complete separation: Does installing fire doors and vestibules in an explosion-proof wall constitute complete separation? 3. Should the evacuation be calculated based on Class C workshops, or does this portion need to be calculated separately for evacuation purposes under Class A?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.