HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Discussion】Public Utilities – Water Resources and Hydropower – 20210416

2021-04-16View Original

Thread Content

The impervious layer of a core rock-fill dam is generally located in the middle of the dam body, sometimes slightly upstream, in order to be connected to the wave wall; it is usually constructed using clay with very low water permeability. We welcome active participation in discussions; the system offers generous rewards for answering questions from VIP members! ! !
Reply #22021-04-16
Correct. The impervious layer of a core-rock dam is generally located in the middle of the dam body; sometimes it is placed slightly further upstream to enable connection with the wave wall. It is usually constructed using clay with very low water permeability.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.