HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Mechanical & Electrical - 20190228

2019-02-28View Original

Thread Content

This post was last edited by hesonchang214 on 2019-3-1 20:02. In ventilation and air conditioning projects, the main aspects of system commissioning include (). A. Duct airtightness test B. Duct light leakage test C. Individual unit trial operation D. Combined trial operation and commissioning without production load E. Duct air leakage test 【Answer】CD 【Explanation】The main tasks of commissioning a ventilation and air conditioning system include: measurement and adjustment of air volume, individual unit trial operation, and combined trial operation and commissioning of the system without production load.
Reply #22019-02-28
A. Duct airtightness test D. Combined trial operation and commissioning without production load E. Duct air leakage test

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.