HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Latest updates on ecological water replenishment in summer! Reviving the life in rivers and lakes: the Ziyaha River, which had been dry for years, is now flowing throughout its entire length

2021-06-29View Original

Thread Content

By 10 a.m. on June 29, the Bozhuang Sluice in Dacheng County, Hebei Province, was opened, allowing water from the Ziyaha River to flow into Tianjin’s territory and merge with the section of the Ziyaha River within Tianjin, thus achieving full connectivity across the entire length of the river. To date, the 627-kilometer network of rivers designated for water replenishment, including the Daqing River, Baiyangdian Lake, Hutuo River, and Ziya River, has been fully connected, with a total of 167 million cubic meters of water having been supplied. On June 11 and 17, the water supply routes to the Daqing River (Baiyangdian) and the Hutuo River were both completed across their entire lengths. To further enhance the water replenishment effect, the Ministry of Water Resources and the People’s Government of Hebei Province, in light of the progress of the water replenishment efforts, continued to supply additional water flow and extended the water supply routes in the direction of the Ziya River. On June 20, the control gate at the Xianxian junction of the Hutuo River was opened, officially initiating ecological water replenishment to the Ziya River. The Ziyah River is a tributary of the Haihe River; it flows through counties and cities such as Xianxian, Hejian, and Dacheng in Hebei Province, and reaches Jinghai District in Tianjin where it merges with the Daqing River. Due to severe water scarcity, the Ziya River has been dry for many years. This water replenishment plays a significant role in restoring the Ziya River ecosystem and reviving life in rivers and lakes. Ecological water replenishment in the summer of 2021 will continue until early July. The relevant departments and agencies under the Ministry of Water Resources, in conjunction with the Hebei Provincial Department of Water Resources, the Tianjin Water Affairs Bureau, and other entities, will further strengthen scheduling, monitoring, supervision, and inspections to ensure that the benefits of water replenishment are sustained. At the same time, the organization evaluates the effectiveness of water replenishment, in order to accumulate experience for the scientific implementation of ecological water replenishment in rivers and lakes in the future, as well as to facilitate the mitigation of groundwater over-extraction. Source: China Water Resources

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.