HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Mechanical & Electrical - 20200523

2020-05-23View Original

Thread Content

The preparation of as-built drawings for mechanical and electrical engineering measurement includes the preparation of measurement drawings for installation ( ), as well as those showing the installation process and its results. A. Survey control network B. Survey benchmark points C. Settlement observation points D. In-process survey points 【Answer】A 【Explanation】The preparation of as-built drawings for mechanical and electrical engineering surveys includes drawing the survey control network for installation, as well as drawing survey diagrams of the installation process and its results

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.