HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Environmental Impact Assessment Announcement] Second public announcement regarding the environmental impact assessment for the Shanghai Xihua (Huoqiu) Pallet Production and Manufacturing Base project

2023-07-10View Original

Thread Content

Second public announcement on the environmental impact assessment for the Shanghai Xihua (Huoqiu) Pallet Production and Manufacturing Base project. In accordance with the relevant requirements of the \"Measures for Public Participation in Environmental Impact Assessment\" issued by the Ministry of Ecology and Environment of the People’s Republic of China (Order No. 4 of the Ministry of Ecology and Environment), after the draft environmental impact report for this project is prepared, a second round of public disclosure of information is necessary. This allows the residents living in areas that may be affected by the project to become aware of the project’s details, and it also enables the public to express their opinions and suggestions regarding the project, thus allowing for public oversight. I. Information on the project owner and the project itself
Project owner: Anhui Xihua Environmental Protection Technology Co., Ltd.
Project name: Shanghai Xihua (Huoqiu) Pallet Production and Manufacturing Base
Location of the project: Northeast corner of the intersection of Keji 2nd Road and Chuangxin 2nd Road, Huoqiu Modern Industrial Park, Hefei High-Tech Zone, Huoqiu County, Lu’an City, Anhui Province
Contact person: Mr. Xu
Phone number: 13305698376
Email address: 287893696@qq.com

II. Information on the agency responsible for preparing the environmental impact assessment report
Agency responsible for the assessment: Anhui Zhongzhen Environmental Engineering Technology Co., Ltd.
Address: Room 1705, Jinzuo Building, Meisheng Central Plaza, No. 368 Baohe Avenue, Baohe District, Hefei City
Person in charge: Engineer Wu
Phone number: 13395641278

III. Web link to the public comment form:
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

IV. Web link to the draft environmental impact assessment report, as well as ways to obtain the printed version
The electronic version of the draft environmental impact assessment report can be found at the Baidu Netdisk link below. If you need a printed copy, please contact the person in charge of the assessment at the agency in question to obtain it. V. Methods and channels for submitting public comments; Scope of those whose opinions are sought: The public whose opinions are being sought includes citizens, representatives of legal persons, or other organizations within the area affected by the construction project. Submission of public comments: Starting from the date this announcement is published, the public may download and fill out the Public Comments Form via the link provided in Section 3, in order to express any opinions and suggestions related to the environmental impact assessment of the construction project. Once the feedback form is completed, it can be submitted to the project owner by mail or email ; Emails can be sent to the address indicated in the first item, and letters can be mailed to the address of the aforementioned construction unit; the contact person and phone number are as listed above. For the public opinion form, members of the public are requested to fill in the contents according to the prescribed format. Forms with missing required information will be deemed invalid. VI. The period for submitting public comments is 10 working days starting from the date of publication of this announcement (from July 10, 2023, to July 22, 2023). Web link to the Environmental Impact Report: Link: https://pan.baidu.com/s/1Cv0_-Hcqfey5LS2MBrh-WA?pwd=fj76 Extraction code: fj76 Note: When submitting comments, the public should provide valid contact information. It is encouraged for individuals to submit their comments under their real names and provide their permanent residential addresses. Anhui Xihua Environmental Protection Technology Co., Ltd. July 10, 2023
Reply #22023-07-11
Shared pallets need to be developed. Check out the “cutting-edge technology” on the device: 29---- Shared tray (highly recommended) https://bbs.hcbbs.com/thread-3106455-1-1.html (Source: Haichuan Chemical Engineering Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.