Thread Content
Recently, the polymerization plant for Tianyue (Tianmen) New Materials Technology Co., Ltd.’s 300,000 tons per year nylon 6 polymerization project, which was constructed by Sinochem Fourth Chemical Construction & Sinochem Labor Services Company, was successfully completed. Zhang Rihui, the company’s deputy general manager, Ding Yun, the chairman of Tianyue (Tianmen) New Materials, and other relevant officials were present to witness the topping-out ceremony. The main body of this polymerization plant has 7 floors with 9 floors in certain areas; its building height is 65.7 meters. It features a frame-shear wall structure, covers an area of 4,085.64 square meters, and has a construction area of 30,693.09 square meters. Since the commencement of groundwork on December 12, 2024, the project team has employed standardized procedures and advanced technical methods to overcome construction challenges such as those associated with complex formwork systems. By working at a rate of 11.5 days per floor, they were able to complete the construction ahead of schedule, finishing the project 4 days earlier than planned. This achievement set a new record for the construction speed of similar chemical plant facilities, earning high praise from the client. “This achievement marks a clear demonstration of the ‘Hua Jian Xiang Jun’ team’s capability to tackle tough challenges. ”The project leader stated that the team strictly adhered to the quality philosophy of \"striving for excellence and delivering high-quality products\" during construction, and through measures such as inspections by all relevant parties and precise coordination of different construction stages, it ensured both progress and quality. Next, the project team will continue to uphold its spirit of taking on challenging tasks, and make every effort to advance the subsequent equipment installation and system debugging, in order to create high-quality project models that contribute to the realization of the group company’s “135” strategy as well as the development of the regional economy.
【Ten Years of Rapid Development in Chemical Equipment】The world’s first tank of green ammonia was successfully dispatched from the Yuanjing Chifeng Zero-Carbon Hydrogen Energy Industrial Park, 2515–2025 https://bbs.hcbbs.com/thread-5696501-1-1.html (Source: Haichuan Chemical Forum)
【Frontiers of HaiChuan Chemical Technology】The China Institute of Petroleum Sciences overcomes the \"three key challenges\" in the technology related to caprolactam production, achieving international leadership levels. https://bbs.hcbbs.com/thread-5696527-1-1.html (Source: HaiChuan Chemical Forum)
From Shenyang to Jianyang: The Sichuan air compression plant that eventually disappeared https://bbs.hcbbs.com/thread-5696530-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Zhucheng in Weifang will see the establishment of China’s first project for the combined combustion treatment of sludge and biomass. https://bbs.hcbbs.com/thread-5696540-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】2520–2025: Combating Rust! ! Baosteel develops \"Danxia Steel®\" weathering steel to ensure the stability of desert photovoltaic mounting structures https://bbs.hcbbs.com/thread-5696575-1-1.html (Source: Haichuan Chemical Industry Forum)
Multiple images: The Daanji green ammonia-based ammonia synthesis integrated demonstration project, set to go into operation soon. https://bbs.hcbbs.com/thread-5696670-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】The world’s first aniline fluidized bed reactor with a capacity of 200,000 tons per year was installed between 2025 and 2528. https://bbs.hcbbs.com/thread-5696727-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】World’s largest bio-based BDO project using 66,000 tons of corn as raw material comes online 2541-2025 https://bbs.hcbbs.com/thread-5696937-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2542–2025: China’s first continuous polyphosphate production facility began trial operation in Dangyang https://bbs.hcbbs.com/thread-5696979-1-1.html (Source: Haichuan Chemical Forum)