**The first arch vault module of the second-phase project at Hainan LNG Receiving Station of the Pipeline Network Group was successfully lifted and positioned

2025-11-06View Original

Thread Content

Recently, the first arch module for the **Hainan LNG Terminal Phase II project of the Pipeline Network Group, which was jointly constructed through EPC by CNPC Sixth Construction Company, was successfully lifted and placed in position. This marks the transition of the main construction phase related to the storage tanks from the preparatory stage to the module-lifting stage, creating favorable conditions for subsequent tasks such as tank interior installation and arch prefabrication. The first vault block module weighs about 21.34 tons and is prefabricated in a modular manner; due to its shape resembling watermelon rind, it is referred to as \"watermelon rind\" by the engineers. Before the lifting operation, the project department conducted safety and technical quality briefings for the on-site workers and those responsible for lifting, and carried out a joint safety and quality inspection to thoroughly identify potential risks. The lifting of the vault block module was carried out using a 320-ton crawler crane; the entire lifting and positioning process took 40 minutes. The vault block module was lifted from the prefabrication site on the south side of Tank No. 3 LNG tank and safely and smoothly transported to the designated location between Tanks No. 4 and No. 5 LNG tanks. **At the Phase II project of Hainan LNG Receiving Station owned by the Pipeline Network Group, three LNG storage tanks with a capacity of 220,000 cubic meters each are currently under construction. The roof of each LNG storage tank is composed of 24 roof panel modules, which are subsequently assembled as a whole inside the tank. The P1 module of the arch roof that is being lifted this time is the first arch roof module for the No. 3 LNG storage tank, and it is also the first module to be lifted at the entire site.
Reply #22025-11-06
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2800 to 2025: Kunming University of Science and Technology, in collaboration with Guangdong, developed China’s first mobile zero-carbon hydrogen production and power generation unit, which was presented at the forum. https://bbs.hcbbs.com/thread-5704545-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first 6MPa 3,500-ton gasification furnace developed as part of the Space Long March project was successfully ignited during the pilot operation of the integrated project for clean and efficient utilization of resources in Xinjiang’s Zhongneng Lvyuan area. https://bbs.hcbbs.com/thread-5704592-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-08
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful trial production of HE700M high-strength, extra-thick welded H-beams by Shansteel Co., Ltd. from 2024 to 2025 https://bbs.hcbbs.com/thread-5704594-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #62025-11-08
【Ten Years of Rapid Development in Chemical Equipment】The key technology project for \"converting coal into high-end carbon materials\" carried out by Zhaoqing Shunxin from 2005 to 2025 has passed the evaluation process. https://bbs.hcbbs.com/thread-5704595-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】2791-2025: Fuda Zijin Hydrogen Energy unveils China’s first 1,000-kilogram-class commercial ammonia decomposition hydrogen production and hydrogen refueling station https://bbs.hcbbs.com/thread-5704209-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-09
【Ten Years of Rapid Development in Chemical Equipment】2792-2025: Breaking Monopolies! Huayou Gongjian Company’s self-developed \"bending pipe tool\" proves useful in East African projects https://bbs.hcbbs.com/thread-5704226-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-09
【Ten Years of Rapid Development in Chemical Equipment】2793-2025: China’s First Integrated Marine Hydrogen, Ammonia, and Alcohol Project Produces Green Methanol https://bbs.hcbbs.com/thread-5704237-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.