[Haichuan Overseas Engineering] China Power Construction is building the world’s largest hybrid wind-solar-storage grid-connected power plant in South Africa

2025-11-11View Original

Thread Content

The Oya Hybrid Energy Project in South Africa is currently the world’s largest hybrid energy plant that combines solar, wind, and storage systems. It is located at the border between the Western Cape and Northern Cape provinces in South Africa, with a capacity of 155 megawatts from solar power, 86.4 megawatts from wind power, and 94 megawatts/242 megawatt-hours from storage systems. Units under China Power Construction, such as the 11th Hydropower Bureau, Beijing Institute, and Northwest Institute, participated in the construction. In total, 18 wind turbines with a capacity of 4.8 megawatts each are planned to be installed in the wind farm area; they will be arranged in series along the mountain ridges on mountains stretching over 30 kilometers in length, at altitudes ranging from 1100 to 1400 meters. To date, the hoisting of 18 turbines has been completed, as well as the electrical installation work for 15 units; the cold commissioning process is also progressing in an orderly manner. Fan hoisting is the most technically complex core stage in the wind power project construction. Each wind turbine consists of four steel tower sections, and its foundation is designed as an anchor bolt cage type gravity spread foundation, making construction extremely difficult. To address key challenges such as high wind speeds in the wind farm, complex terrain, and short installation windows, the project team took targeted actions to successfully overcome the technical difficulties associated with installation in such complex environments. It achieved millimeter-level precision in the docking of tower sections and the assembly of the turbine blades, providing a solid foundation for the long-term safe operation of the wind turbines. Upon completion, the project is expected to provide South Africa with approximately 570 million units of reliable and stable clean energy per year, which will be of great significance in enhancing the country’s electricity supply capacity, alleviating its long-term power shortages, facilitating the transformation of its energy structure, and contributing to the achievement of sustainable development goals.
Reply #22025-11-11
【Ten Years of Rapid Development in Chemical Equipment】2794–2025: Chinese scientists overcome the high-carbon-emission challenge in Fischer-Tropsch synthesis, giving this century-old process a low-carbon future https://bbs.hcbbs.com/thread-5704322-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-11
【Ten Years of Rapid Development in Chemical Processing Equipment】2796-2025: Construction Management of Ethylene Process Piping Projects at Huanqiu Liujiàn’s Tarim Project Site – Completion of All Tasks https://bbs.hcbbs.com/thread-5704422-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-11
【Ten Years of Rapid Development in Chemical Processing Equipment】2797-2025: Guangxi Petrochemical’s world’s first variable-frequency drive system enables hot standby switching for compressors in electrically driven ethylene production units. https://bbs.hcbbs.com/thread-5704443-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-13
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-13
【Ten Years of Rapid Development in Chemical Equipment】The largest domestic project of its kind for continuous polymerization on a scale of 5,000 tons per batch of para-aramid fibers was successfully put into operation between 2021 and 2025. https://bbs.hcbbs.com/thread-5704579-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-13
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2816 to 2025: The robot-based automatic loading machines developed by Changzhou Daojin have solved the problem of difficult loading. https://bbs.hcbbs.com/thread-5705014-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-11-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first carbon dioxide + flywheel energy storage demonstration project was completed in Deyang, Sichuan, from 2003 to 2022. https://bbs.hcbbs.com/thread-5704593-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-11-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs achieved in key technologies for turning phosphogypsum from waste into a valuable resource from 2017 to 2025 https://bbs.hcbbs.com/thread-5705021-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.