Thread Content
What are contingency rebar? Simply put, any rebar for which no information is specified in the structural drawings belongs to contingency rebar. To ensure that the rebar in the drawings is in the correct position after construction, the rebar added separately by the construction workers is called supplementary rebar. Specifically, the shims placed between the double layers of rebar in beams, the stirrups in raft slabs and floor slabs, the bracing rebar in shear walls as well as the horizontal positioning stirrups, and the formwork positioning rebar in frame columns all fall under the category of temporary rebar. In rebar work, are there any regulatory guidelines regarding supplementary rebars, such as those used in cast-in-place slabs? Their placement is determined based on the actual project requirements: first, it must be carried out in accordance with the requirements of the construction plan, and approval from the client is necessary ; Second, project negotiations should be carried out based on the actual usage conditions of the project, and signatures and seals from the supervisor, the client, and the construction party are all required. During construction, if steel reinforcement replacement is necessary, it is essential to fully understand the design intent and the properties of the replacement material. Any replacement of rebar in critical areas must be approved by Party A and the design unit, and such replacement may only take place upon receipt of written approval. The measures rebar shall be included in the quantity of the actual rebar work
【Ten Years of Rapid Development in Chemical Equipment】2846-2025: The first domestically produced million-ton-class methanol synthesis reactor passed the factory acceptance test https://bbs.hcbbs.com/thread-5706030-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】2840-2025: Maoming Gravity Manufacturing and CNPC’s independently developed first set of modular polypropylene loop reactor systems https://bbs.hcbbs.com/thread-5705786-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2841-2025: Longyu’s low-temperature heat coupling distillation technology for coal chemical processing recognized https://bbs.hcbbs.com/thread-5705831-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Equipment’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2842-2025 **The research on ‘Key Technologies for Surface Treatment of Storage Tanks in Pipeline Systems, as well as the Development and Industrial Application of Intelligent Maintenance Equipment’ has been evaluated as being at an internationally leading level** https://bbs.hcbbs.com/thread-5705865-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s largest seamless steel pipe production line, 2843-2025, was officially put into operation at Shandong Guangfu Group. https://bbs.hcbbs.com/thread-5705991-1-1.html (Source: Hachuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2844-2025: China’s first project for generating electricity from the residual pressure of high-pressure natural gas transmission pipelines – the Haimen Station natural gas residual pressure power generation project – has been put into operation in Nantong, Jiangsu. https://bbs.hcbbs.com/thread-5706004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 2845-2025 2MW/600℃ ultra-high temperature heat pump energy storage demonstration project was successfully commissioned on its first attempt. https://bbs.hcbbs.com/thread-5706020-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Hai Chuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】SINOPEC’s Research Institute of Petrochemical Technology’s high-efficiency catalytic cracking (RTC) technology was tested and calibrated at Zhenhai Refining & Chemical Complex from 2023 to 2025. https://bbs.hcbbs.com/thread-5705591-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))