How to construct concrete in 40-degree heat? This is the correct way to apply ash in the summer!

2026-05-05View Original

Thread Content

When the temperature exceeds 40 degrees, once the concrete is taken out of the mixer, it’s a race against time. In such a short distance from the mixing plant to the construction site, the slump of the concrete can drop by half. As soon as the workers connect the pipes and see that the mixture has dried out, they have to add water; and this addition of water causes the water-cement ratio to get out of control, resulting in a decrease in the concrete’s strength by one grade. It’s not that the workers are lazy; it’s simply that they have no other options. High-temperature construction isn’t meant to test whether the concrete can withstand such conditions, but rather to check whether temperature control measures have been put in place in advance. Today, I’ll explain once and for all the correct way to apply ash at 40 degrees of high temperature. The first step is to avoid pouring concrete when it’s hot. Instead, pour the aggregate first. Aggregate is the largest component by volume in concrete, and it also acts as a heat reservoir that absorbs a lot of heat. When sand and gravel are exposed to the sun, their internal temperature can reach 50 to 60 degrees; until the temperature of the aggregate drops, it’s not possible to create concrete with a low temperature using cool water. The correct approach is to keep watering the aggregate pile before pouring the concrete, using the evaporation of water to remove heat from the aggregate. It’s not sufficient to water it once and then ignore it; the aggregate needs to remain moist in order to cool down. Sand and gravel should be watered separately in order to control their temperatures. The temperature of the aggregate should also be measured before adding it to the mixture – if the temperature is still high and has not dropped, mixing cannot take place. If this step is skipped, all subsequent measures for temperature control will be ineffective. In the second step, the mix ratio must be adjusted accordingly; retarding agents and water reducers should be used together. Part of the water used in mixing should be replaced with ice water. In hot weather, concrete sets at an astonishingly fast rate, and as transportation time increases, the slump loss occurs very rapidly. If the mix ratio isn’t changed, it’s equivalent to making the mixture drier. The inclusion of retarding water reducers can extend the setting time and control the loss of slump over time. When necessary, ice can be used to replace part of the mixing water; it’s not necessary to replace all of the water with ice water. The temperature of the mixture should be kept below 30 degrees. Using ice water for cooling is more effective than sprinkling water on the aggregates, as it introduces cold material directly into the mixture, rather than relying on cooling the material by sprinkling water on it after it has been heated up. In the third step, misting is used on-site to reduce temperature, along with shading; it is necessary to avoid pouring concrete during periods of high temperatures. The misting is meant to lower the ambient temperature, not by watering the ground, but by using atomized water vapor, thereby slowing down the evaporation rate from the concrete surface. The formwork and rebar are also affected by high temperatures; it is necessary to spray water inside the formwork to cool it down before pouring. Sunshades should be used to cover the rebar frames in order to prevent the formwork and rebar from acting as heat sources. The timing of pouring must be carefully planned – the period from 11 a.m. to 3 p.m. is characterized by high temperatures and strong sunlight, so this time should be avoided. It is better to carry out pouring in the cooler early morning or evening hours, or at night. This is not about compensating for working on weekends, but rather about giving priority to proper concrete curing conditions: it is better to have workers work shifts rather than allow the concrete to cure under high temperatures. In the special plan for concrete work prior to the onset of summer, all aspects such as cooling of aggregates, the ratio of ice to water, the amount of retarding agent to be used, and the timing of pouring are determined in advance. There’s no need to wait until summer to take action; as soon as the temperature reaches 35 degrees, it automatically switches to a high-temperature construction mode. When pouring concrete at a temperature of 40 degrees Celsius, relying solely on the diligence of the workers is not enough to prevent problems. If the aggregate is not cooled, the temperature of the concrete as it exits the mixer is not controlled, the mix ratio is not adjusted, and there is no shading or misting at the construction site, then cracks will definitely appear.
Reply #22026-05-05
【History of Haichuan Chemical】The Pioneer of Barium Salt Industry in New China – Old Photos of Xinji Chemical Plant https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719561 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32026-05-05
【History of Haichuan Chemical Industry】The most comprehensive graphic and textual introduction—Jinxi Chemical Machinery Factory: The cradle of chemical machinery manufacturing in China https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719589 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-05-05
【Haichuan Chemical Valve Management】Series of Posts—Proper management of valves is the foundation for stable operation. Everyone is welcome to share and exchange ideas! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719309 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #52026-05-06
【Ten Years of Rapid Development in Chemical Processing Equipment】By 3106-2026, the flange thickness will reach 165 millimeters! Magang Co., Ltd. successfully developed the thickest and heaviest hot-rolled H-beams in the world. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719152 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-05-06
【HaiChuan Chemical Valve Management】Series Posts -- Specifications for Safety Valve Tear Orifices (Tear Holes, Drain Holes) https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719673 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72026-05-06
【Ten Years of Rapid Development in Chemical Equipment】New Breakthroughs from 2031 to 2026! The first domestically produced slurry pump completed its engineering validation in TEDA https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719182 (Source: HCH Chemicals Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-05-06
【Ten Years of Rapid Development in Chemical Processing Equipment】Aerospace Technology Boosts Safety in Coking! The independently developed tension monitoring system for coke oven commutators has completed 180 days of field application testing. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719732 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Reply #92026-05-07
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 15 million tons per year coal upgrading project carried out by Xinjiang HuiNeng from 2013 to 2026 uses boilers with high-temperature lignite solid particle waste heat recovery converters. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719793 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-05-07
When HR asks, “Do you have any other questions?” ”How should one answer to score points? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719142 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.