HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

LNG storage tank testing

2017-09-13View Original

Thread Content

After the 200 cubic meter LNG storage tank is prefabricated in the factory and passes the tests, is pressure testing still required on-site? Are there any specifications?
Reply #22017-09-28
Overall shifting means that installation is not required in common usage; it should come with a supervision and inspection report from the factory.
Reply #32017-10-09
Of course, pressure testing is necessary; the standards should follow those in the industry

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.