HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For ventilation in the granulation plant of polypropylene facilities, is it necessary to have ventilation ducts leading to the roof?

2020-12-04View Original

Thread Content

As the title suggests, could any expert please share information about their own setup? Thank you!
Reply #22020-12-06
After aggregation, it is an orderly discharge – is monitoring required?
Reply #32020-12-24
Axial flow fans can be installed at the top of the floor. The feeding system requires operation under negative pressure with a nitrogen seal; the exhaust gas from the recovery system is released into the atmosphere after passing through a bag filter, and regular inspections are carried out
Reply #42020-12-25
I consulted the design firm, and they said there are no specific requirements; it can be discharged directly outside without needing to be led to the top of the factory building

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.