HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Trial operation of Mitsui Chemicals’ 120,000-ton/year Tafmer polyolefin elastomer (POE) plant in Jurong, Singapore

2025-12-11View Original

Thread Content

Currently, Mitsui Chemical’s 120,000 tons per year Tafmer polyolefin elastomer (POE) plant located on Jurong Island in Singapore is in the trial operation phase, with commercial operations set to begin in the second half of Mitsui’s fiscal year, that is, in March 2026. Osamu Yoshida, Executive Director and Chief Financial Officer of Mitsui Chemicals, Inc., explained, “Even after starting up, we don’t want to reach full capacity right away.” ” Osamu Yoshida went on to point out that while efforts are being made to expand the sales of Tafmer into new application areas, the supply and demand balance for POE materials faces challenges. Last year, Mitsui reported that competition in the solar panel market had intensified, which was a key focus for its POE expansion, especially due to inventory adjustments in China. Therefore, the group is working to expand the sales of Tafmer to high-performance packaging materials, engineering polymers, footwear, and other application areas. Regarding automotive applications, Osamu Yoshida said, “Some of our customers are bound by contracts that require them to purchase specified materials only at set times, so the transition is expected to take some time.” ”
Reply #22025-12-11
【Ten Years of Rapid Development in Chemical Equipment】2894-2025: SINOPEC CRIC Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #32025-12-11
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons per year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technology. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #62025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】For the first time in China, a full-scale venting test of a 10-megapascal high-pressure hydrogen pipeline was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-13
【Ten Years of Rapid Development in Chemical Equipment】2894-2025: SINOPEC CRIC Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】2896-2025: China’s first AI-based intelligent pipeline inspection model is put into industrial use at Bao Shi Pipeline Industry https://bbs.hcbbs.com/thread-5708019-1-1.html (Source: HaiChuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】2897-2025: CNOOC’s equipment development efforts have led to the successful use of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #112025-12-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for agglomeration using coal gangue on a scale of ten million tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.