HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the selection of air compressors

2019-05-09View Original

Thread Content

There is a project that requires 2.75 cubic meters of air per minute for its calculations; what will be the consequences if an air compressor with a capacity of 6 cubic meters per minute is used instead?
Reply #22019-05-11
There are no consequences; choosing a compressor that is too large leads to wasted energy consumption. The advantage is that when demand increases in the future, an upgrade can be done without the need to install a new compressor
Reply #32019-05-12
It is often uninstalled or remains in standby mode for long periods; it can be used if subsequent devices are needed

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.