HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Precautions for converting condensing steam turbines into back-pressure steam turbines

2025-10-29View Original

Thread Content

Dear experts, our company operates a industrial waste incineration power plant, and the turbines used are Qingdao Jieneng condensing turbines of type N9-3.9. In order to improve economic efficiency, we plan to convert these existing condensing turbines into back-pressure turbines. What precautions should be taken? Are there any relevant experiences that can be referenced? I’m really hoping for some advice.
Reply #22025-10-30
Seek technical support from the original manufacturer, Qingdao Jieneng.
Reply #32025-10-31
A newly purchased one costs around 200-300, and it’s more efficient as well
Reply #42025-11-04
Is 200-300 the cost for a single device, or does it include the entire piping system as well?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.