HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Annual submission materials from the design unit

2017-06-02View Original

Thread Content

Pressure vessel design firms are required to submit reports on their design work every year; those who have templates for such reports would be kind enough to share them. Thank you!
Reply #22017-06-02
Are you referring to xx drawing number, xx location code, xx equipment name, xx project name, xx designer, xx reviewer, xx approver, and xx date of signature?
Reply #32017-06-02
It is required to be reported, but no one cares if factory enterprises fail to do so.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.