Thread Content
Regarding the exemption calculation for opening reinforcement in GB150, which of the following opening reinforcements cannot be directly exempted from calculation using sw6, but require separate reinforcement calculations () A. Reinforcement of the opening of the flat cover B. Opening of radial holes in the cylinder (perpendicular to the front view of the cylinder, but not pointing to the center line) C. Reinforcement of the opening of the tapered head D. Opening of elliptical holes in the cylinder E. The container adopts a hydraulic test F. Meets all the requirements of GB150, but fails the SW6 calculation.
This post was last edited by SDHZZXM on 2017-8-16 10:23 Regarding the exemption calculation of opening reinforcement on GB150, which of the following opening reinforcements cannot be directly exempted from calculation using sw6, but requires separate reinforcement calculation (B)
Regarding the exemption calculation for opening reinforcements in GB150, which of the following opening reinforcements cannot be directly exempted from calculation using sw6, but require separate reinforcement calculations (BD)
Regarding the exemption calculation for opening reinforcements in GB150, which of the following opening reinforcements cannot be directly exempted from calculation using sw6, but require separate reinforcement calculations (ABCF) A. Reinforcement of openings in flat cover B. Opening of radial holes in the cylinder (perpendicular to the front view of the cylinder, but not pointing to the center line) C. Reinforcement of openings in the tapered head D. Opening of elliptical holes in the cylinder E. The container adopts a hydraulic test F. Meets all the requirements of GB150, but fails the SW6 calculation.