Thread Content
Circular from the Special Equipment Bureau of the General Administration for Quality Supervision, Inspection and Quarantine on the Supervisory Spot Checks and Administrative Penalties Related to Administrative Licenses for Special Equipment in 2017 – Quality Supervision Special Letter [2017] No. 80: To the quality and technology supervision bureaus (market supervision and administration departments) of various provinces, autonomous regions, and municipalities directly under the Central Government, as well as relevant organizations: In order to strengthen supervision over those entities that are authorized to produce special equipment, as well as over inspection, testing, and evaluation agencies, ensure that they continue to meet the requirements for such licenses, and enhance the role of these agencies in conducting evaluations, in accordance with the relevant provisions of the Law on Safety of Special Equipment, the Law on Administrative Licenses, and the Regulations on Safety Supervision of Special Equipment, our bureau carried out supervisory spot checks on 141 such entities in 2017. Those entities that no longer met the required standards or that seriously violated relevant regulations were dealt with accordingly. The relevant information regarding supervision and random inspections, as well as administrative penalties, in 2017 is reported as follows: I. Methods of supervision and random inspections (1) Supervision and random inspections after certification or delegation These inspections focus on the operation of the quality system, the quality of work (products), and resource conditions, and are carried out on certified manufacturing units, testing and inspection institutions, as well as appraisal and evaluation organizations. For this random inspection of certified special equipment manufacturing units and inspection and testing institutions, a \"double-random\" inspection mechanism was adopted, which involves randomly selecting the entities to be inspected as well as the inspectors to carry out the inspections. (II) Supervisory spot checks before certification issuance following evaluation: Supervisory spot checks before certification issuance following evaluation (hereinafter referred to as process supervision spot checks) focus on assessing the quality of the evaluation work, and are conducted as supervisory spot checks on entities applying for administrative permits for special equipment after the evaluation but before certification issuance. II. Supervisory sampling inspections (I) Sampling inspections of production units A total of 85 production units were subject to supervisory sampling inspections this time, including 10 boiler manufacturing units, 11 pressure vessel manufacturing units, 5 gas cylinder manufacturing units, 15 pressure pipeline component manufacturing units, 9 elevator manufacturing units, and 35 manufacturers of special-purpose motor vehicles for use in sites (factories). The main aspects of the random inspections carried out on special equipment manufacturing units focus on whether the units continue to meet the requirements for licensing, and whether the product quality complies with the requirements of safety technical specifications and relevant standards. Special attention is paid to changes in the units’ resource conditions, the operation of their quality assurance systems, and product quality control measures. Based on the results of the random inspections, most of the inspected units were able to carry out special equipment production in accordance with laws and regulations, safety technical specifications, and relevant standards, ensuring the quality of their products ; However, there are also a small number of units whose resource conditions deteriorate after obtaining the permit, whose quality assurance systems are not properly implemented, and whose product quality and safety performance decline, rendering them unable to continue to meet the requirements of safety technical specifications. The main problems identified during the spot checks are as follows: 1. In some boiler-related units, materials were stored in a disorganized manner with unclear labeling; label transfer was not carried out, and the material certification documents lacked signatures from responsible persons, etc ; Some of the security technical specifications and standards used have expired or been repealed, etc ; The pressure testing site lacks safety protection facilities ; Some units lack process documents, or the process documents have not been approved. Some quality management system documents lack completeness, with missing necessary processes, elements, or management systems; furthermore, the quality assurance system documents have not been updated or revised in a timely manner ; The quality manager is unable to perform their duties properly, and the quality oversight personnel cannot cover all manufacturing processes or aspects ; The quality management system documents lack unique identifiers ; Internal audits did not cover all departments, and no corrective actions were taken regarding the nonconformities identified during the audits ; No management review or assessment of quality objectives was conducted ; The instruments and equipment have not been calibrated or verified as required ; A product manufacturing quality plan has not been prepared, or the quality plan does not cover all aspects. 2. The materials used by some units involved in pressure vessel construction lacked quality certification documents; re-inspection was not carried out as required, and no approval procedures were followed for the use of alternative materials ; Incomplete information on welding and welding inspection records, etc. The material storage areas in some units do not meet the usage requirements. Some quality management system documents lack completeness, with missing necessary processes, elements, or management systems; furthermore, the quality assurance system documents have not been updated or revised in a timely manner ; No internal audit was conducted ; No management review or assessment of quality objectives was conducted ; Welding procedure qualification is incomplete or incorrectly referenced ; The instruments and equipment have not been inspected or calibrated, etc. 3. The number of non-destructive testing personnel in the gas cylinder department does not meet the requirements ; The proportion of technical personnel does not meet the requirements ; The production equipment available is not sufficient to meet the production needs ; Lack of welding laboratory ; The airtightness testing site lacks safety protection facilities and the like ; Some unit hydraulic pressure blasting test data has been altered ; No heat treatment curves, etc. The internal audits of some units do not cover all elements ; The person responsible for the quality control system failed to fulfill their duties as required ; No commission order for non-destructive testing ; The materials were not marked and transplanted as required; no material requisition form was available when the materials were issued ; The instruments and equipment have not been inspected or calibrated, etc. 4. For some components of pressure pipelines, the individual materials lacked quality certification; re-inspection was not carried out as required. There were no records regarding the storage, preservation, drying, and distribution of these materials, and the material labeling did not comply with the regulations ; The number of certified welders does not meet the requirements ; The proportion of technical personnel does not meet the requirements ; Some units failed to carry out non-destructive testing as required ; Missing inspection records, or inspection data not recorded, etc ; Production equipment such as sample preparation and impact testing machines fails to meet the requirements of actual production, etc. Some units have failed to appoint technical supervisors, quality managers, and personnel responsible for the quality control system in a timely manner ; Some quality assurance system documents per unit of mass lack the necessary management systems, job responsibilities, and record forms ; The quality assurance system documents were not updated or revised in a timely manner, and they did not undergo the required approval process ; No management review and internal audit were conducted ; Quality target assessment was not conducted ; The instruments and equipment have not been inspected or calibrated, etc. 5. The number of professional and technical personnel in some units responsible for elevators and specialized motor vehicles used within the facility does not meet the requirements ; The welder does not possess a certificate for working on special equipment, or the certificate is not valid ; The testing equipment has exceeded its statutory calibration period. The quality system documents lack necessary procedure documents such as welding control and heat treatment control ; Management reviews, internal audits, etc. were not conducted as required ; The lists of qualified suppliers in some units are incomplete, and no evaluations have been conducted on some suppliers of qualified products ; The records and archives are incomplete and insufficient; the records from the production process do not meet the requirements specified in the corresponding procedure documents ; The management of technical documents is rather chaotic; the signatures on the drawings and calculation documents are incomplete, and the calculation processes do not conform to the relevant standards. Some units lack complete technical documents such as calculation sheets, drawings, and process documents ; The factory inspection did not meet the requirements ; The factory-supplied materials such as the user maintenance manual were not provided as required ; Not all important components were inspected. (II) Inspection and testing agency sampling inspections: A total of 25 special equipment inspection and testing agencies were sampled this time, and the main issues identified were as follows: 1. In terms of resource conditions, some agencies lacked sufficient inspection personnel. 2. In terms of the establishment and implementation of quality management systems, some institutions have failed to update or revise their inspection and testing procedures in a timely manner ; No management review was conducted, or the inputs for the review are incomplete ; Supervisory control over the inspection and testing processes and results was not implemented as required ; Samples were not collected on-site at the manufacturing unit, and the sampling base does not meet the requirements ; The instruments and equipment have not been inspected or calibrated. 3. In terms of quality inspection, there are no corresponding test records or detailed reports to support the inspection results ; The inspection and testing records are incomplete ; Inspection and testing were not carried out in accordance with the requirements of safety technical specifications. (III) Random inspections by appraisal and evaluation agencies: A total of 12 special equipment appraisal and evaluation agencies were subject to supervised random inspections this time. The main problems identified during the spot checks are as follows: 1. Regarding the establishment and implementation of quality assurance systems, some institutions failed to conduct on-site verification of the corrective actions taken by applying entities ; Some of the major issues identified during the review were not properly reflected in the records of the evaluation process ; Some review items lack supporting materials for their conclusions ; Relevant records are missing in the quality management system documents ; Quality management lacks supervision or remains a mere formality. 2. Regarding the quality of accreditation and evaluation work, some institutions’ records of accreditation and evaluation are missing serial numbers, signatures, or relevant items ; There are cases of delays in issuing reports, typing errors, and omissions ; The memorandum does not specify a deadline for making corrections ; Some parts of the memorandum are inconsistent with the system regulations table ; The evidence of corrective actions failed to demonstrate the corrective measures taken ; The submission time of the review report does not meet the requirements. (IV) Results of the process supervision and spot checks: This round of process supervision and spot checks on special equipment mainly pertained to the appraisal and evaluation work conducted by 12 appraisal and evaluation agencies. A total of 19 applicant entities were inspected. The main issues identified during the random inspections are as follows: 1. Regarding the establishment and implementation of quality assurance systems by the applying organizations, in some cases the qualifications and professional titles of the personnel responsible for these systems were incomplete, and the records of instruments and equipment were incomplete ; The appointments of quality system assurance officers, technical supervisors, and system managers are incomplete; responsibilities are not clearly defined. There are insufficient operation manuals, and some important control elements are missing. The signing of records related to verification activities is also incomplete ; Failure to properly implement regulatory standards ; Social insurance procedures have not been completed for certified pressure welders ; Problems exist in the design documents for pressure vessels and pressure pipelines ; Some design firms fail to provide users with feedback in a timely manner regarding the revised design drawings or modified documents. 2. The quality assessment memorandum for the appraisal review does not specify the method for confirming corrective actions. III. Measures to be taken regarding the units with issues: (1) Initiate investigations into Luoyang Petrochemical Fittings Manufacturing Co., Ltd., Henan Xingguan High-Tech Co., Ltd., Xuancheng Baina Pressure Vessel Manufacturing Co., Ltd., Shandong Tianmai Pipe Industry Co., Ltd., Shandong Tianhai High-Pressure Vessel Co., Ltd., the Quality Inspection and Testing Center for Hydraulic Metal Structures under the Ministry of Water Resources, and the Quality Inspection Institute for Instruments and Components in the Machinery Industry (**Quality Supervision and Inspection Center for Instruments and Components). Based on the results of these investigations, appropriate administrative penalties shall be imposed in accordance with the law. (II) Order the Wuhan Port Machinery Quality Supervision, Inspection and Testing Center and the Type Test Institution under the Hebei Provincial Special Equipment Supervision and Inspection Institute to make corrections. During the rectification period, their type test activities shall be suspended for six months ; The Chengdu Chemical Pressure Vessel Inspection Station was ordered to carry out rectifications; inspection and testing activities were suspended for 6 months during this period. (III) Issue a reprimand to Guangdong Asia-Pacific Theo Elevator Co., Ltd., Suzhou Fenhu Elevator Technology Co., Ltd., Zhenjiang Haitai Boiler Manufacturing Co., Ltd., Guangzhou Juyi Steel Pipe Manufacturing Co., Ltd., and Zhejiang Pump and Valve Product Quality Inspection Center. The violations by some of the units selected for inspection are still under further investigation. Upon completion of the verification, actions will be taken in accordance with laws and regulations based on the verification results. IV. Requirements for subsequent actions (1) The production units and inspection and testing institutions mentioned above should draw lessons from this incident, identify the problems existing in their own operations, formulate practical and effective corrective measures to address these issues and eliminate potential safety hazards, and submit reports on the progress of these corrections to our bureau ; All units subject to spot checks must rectify the non-conformities listed in the supervision and spot check memorandum; these will be regarded as key inspection items during the re-certification assessment. (II) The problems identified during spot checks at production units reveal issues related to work quality, such as a lack of responsibility on the part of relevant appraisal and evaluation agencies as well as inspection and testing agencies, and a general lack of accountability among their staff. Our bureau will conduct interviews with these inspection and testing agencies and appraisal and evaluation agencies, requiring them to identify, address, and rectify the existing problems. They must also take this as a lesson and carry out their work in strict compliance with laws, regulations, and relevant safety technical standards. (III) Provincial quality and technical supervision departments shall strengthen oversight at the source, increase supervision and random inspections of certified manufacturing units within their jurisdictions, as well as oversight of testing and inspection institutions, and take strict action to address any illegal or irregular activities. Quality and technical supervision departments at all levels shall, in accordance with their respective responsibilities, supervise and inspect, in line with the law, the progress of rectification by the production units and testing institutions that were found to have problems during this supervision and random inspection. Such units shall be designated as key targets for supervision, with increased frequency of random inspections. (IV) The entities holding certificates for various special equipment, as well as the assessment and evaluation agencies, should conduct thorough self-inspections and self-corrections in light of the problems identified during this supervision and random inspection, in order to continuously improve the quality of such equipment and the standards of their assessment work. V. Report on Administrative Penalties in 2017 (I) Shenzhen Meilian Fuji Elevator Co., Ltd. provided fake type-test elevators during the application process for a license to manufacture special equipment, thereby obtaining the license by deception. Our agency has imposed administrative penalties on this entity in accordance with the law, revoking the license of Shenzhen Meilian Fuji Elevator Co., Ltd. (II) Beijing Keno Boiler Co., Ltd. submitted false materials when applying for a renewal of its boiler manufacturing license. In accordance with the ruling of the People’s Court, our agency has imposed an administrative penalty on this entity in accordance with the law, and has decided not to accept this application for renewal of the boiler manufacturing license. (III) In the process of applying for the pressure pipeline installation licenses GC1 and GB1 (including the PE-specific category), Luzhou Huakun Petroleum Chemical Equipment Co., Ltd. provided false information regarding the professional titles of the personnel involved in the quality assurance system, as well as false materials related to the trial installation of the pipelines. In accordance with the law, our agency has imposed administrative penalties on this entity, revoking the pressure pipeline installation licenses GC1 and GB1 (including the PE-specific category) issued to Luzhou Huakun Petrochemical Equipment Co., Ltd. (IV) In 2015, He Feng submitted false educational certificates when applying for a certificate for special equipment inspection and testing personnel (cylinder inspector), and obtained such a certificate. Our agency has imposed administrative penalties in accordance with the law, revoking He Feng’s certificate as a special equipment inspection and testing personnel (cylinder inspector). Attachment: Specific issues identified during the random inspections. Bureau of Special Equipment, General Administration of Quality Supervision, Inspection and Quarantine. December 28, 2017 (This document is made publicly available). Attachment: Specific issues identified during the random inspections. I. Luoyang Petrochemical Parts Manufacturing Co., Ltd. No person in charge of physics and chemistry, nor anyone in charge of forging has been appointed ; The heat treatment equipment does not meet the requirements for pipe fitting production, and subcontracting is involved ; The ultrasonic testing process lacks the requirements for ultrasonic testing of forgings and similar materials ; Product inspection records, process flow cards, process flow cards for steel butt-welded seamless elbows, etc., lack signatures of responsible persons ; The labeling of the mechanical property specimens does not meet the requirements ; The on-site materials do not match the product markings and specifications; the steel pipes and steel plates in the raw material warehouse lack labeling, and there are no batch numbers ; The secondary inventory of welding materials contains a large amount of bulk electrodes, which are stored in a manner that does not meet the requirements for preventing moisture; moreover, the records related to the baking of these welding materials are incomplete ; The welder used unwashed electrodes for welding, as these electrodes were not placed in insulating containers ; Chemical analysis of the bend pipe surface revealed patch welding at the sampling pit area, with no records of such work. Forged from steel billets purchased independently; no records of heat treatment or physical and chemical testing of the forgings are provided ; For the elbows used in pipelines, the dimensional inspection items in the final product inspection report are incomplete; elbow bends lack the angle values ; In factory prefabrication, assemblies composed of straight-seam submerged arc welded pipes and pipe fittings such as elbows are used; the steel pipes are formed by longitudinally rolling and welding steel strips (12m in length). The rolling process is carried out by external contractors, while the straight-seam welding is done by the company itself. The heat treatment process is also outsourced, but there is no record of the heat treatment parameters, and the company does not hold a license for manufacturing welded steel pipes ; Non-destructive testing using X-rays on the straight-seam submerged arc welded pipes, as well as the welded elbows and reducers produced by them, revealed numerous defects that exceeded the specified limits, and there are no records of any rework or additional welding being carried out. A random inspection of the documents for the welded elbows revealed that the quality certificates for the welding materials were missing ; The process records consist only of the process cards and delivery inspection records; there are no welding inspection records, no records of the receipt and issuance of welding materials for baking, and no original non-destructive testing records. Upon random inspection of the documents for seamless elbows, the heat treatment curves lack the furnace number, date, and signatures of the operator responsible ; The factory inspection report did not measure the surface quality, the inner diameter at the end, and the A-value from the center to the end face. II. Henan Xinggao High-Tech Co., Ltd. The proportion of technical personnel does not meet the requirements; there is a lack of professionals in polymer science ; No quality assurance engineer has been appointed, nor have responsible persons for materials, production, and finished product inspection been assigned ; The responsibilities, authorities of the responsible personnel do not match those specified in the appointment documents ; The quality manual, procedure documents, work instructions, etc. have not undergone preparation, review, and approval, nor are they stamped with the “Controlled Document” mark ; The “Extrusion Molding Process Control Program” is not included in the quality assurance system ; The raw material warehouse does not have a dedicated area for PE mixtures intended for use with gas; the grades, levels, and batches of different raw materials should all be clearly indicated by labels ; No internal audits or management reviews were conducted. For some type-test products, the quality certificates for the raw materials were not provided, nor were there any reports on the retesting of those raw materials; furthermore, there was no proof of the batch numbers of the raw materials ; Finished product inspection reports and quality test reports are provided, but no batch information is available, making it impossible to trace the origin ; Missing inspection records for the production process ; The quality inspection report indicates the regulated pressure, which exceeds the allowable operating pressure of the pipe ; The finished product inspection report is missing the original records; there are no specific data on the testing process, the time at which the geometric dimensions were checked is not indicated, and there are no signatures from the inspectors or responsible personnel. III. Xuancheng Baina Pressure Vessel Manufacturing Co., Ltd. The person assigned responsibilities for inspection and testing, design, and process quality control is the same person; no person has been appointed for batch management quality control ; The proportion of technical personnel related to the manufacturing of welding gas cylinders does not meet the requirements ; Airtightness test; baking equipment shared with other units ; The hydrostatic test cannot automatically record the bottle number ; The medium-frequency induction furnace used for heat treatment has only a heating zone without a insulation zone; it has only one temperature measurement point, and the automatic recording and temperature display functions are damaged ; The airtightness testing area lacks safety protection measures ; The product warehouse is shared with other units ; Welding-free laboratory ; The quality objectives lack assessment methods and assessment records ; Qualified suppliers were not evaluated. For some liquefied petroleum gas cylinders, no evaluation of qualified suppliers was conducted for the steel sheets, and the person responsible for the materials did not sign to confirm the steel quality certificates or re-inspection reports ; The heat treatment furnace number is not recorded on the heat treatment disk diagram. On-site inspection revealed that the actual heating and holding time for heat treatment was 1 minute in total, whereas the \"Heat Treatment Guidelines\" as well as the regulations for evaluating heat treatment processes specify that the heating and holding time should be 7 minutes each ; The processing of the tensile and bending specimens (including the base metal and welds) did not meet the requirements specified in the drawings, and the specimens were not labeled. The measuring devices, inspection and testing equipment used in cylinder manufacturing were not calibrated/verified ; Internal audits do not include elements such as welding, heat treatment, and non-destructive testing controls ; Some liquefied petroleum gas cylinders lack non-destructive testing commission forms, as well as records of heat treatment processes ; Some heat treatment inspection reports lack records of the holding period, as well as record curves for this holding phase; the actual heating time was 33 seconds, which does not match the 7 minutes indicated in the heat treatment inspection report ; Some batch numbers lack records of bottle mouth thread inspection ; For some batches of products, the welders responsible for welding do not possess the required qualifications ; Manufacturing process cards for YSP23.5 liquefied petroleum gas cylinders have not been prepared, etc. IV. Zhenjiang Haitai Boiler Manufacturing Co., Ltd. The quality assurance engineers and quality control staff fail to fulfill their duties, and the persons responsible for welding are unable to carry out their normal job responsibilities ; Lack of provisions for other process controls, as well as rules for maintaining records of document and contract reviews ; The basis for compiling the \"General Procedures for Non-Destructive Testing\" has expired ; Quality target assessment was not conducted ; Welding materials are left unattended, and there are no records for their storage, distribution, or retrieval ; A Welding Procedure Qualification Report that meets the requirements of NB/T47013 has not been provided ; Manometers, thermometers, etc. have not been calibrated ; Internal audits did not cover all elements ; For some boilers, the key pressure-bearing components manufactured externally lack inspection sheets; the inspection criteria for wave-shaped furnace chambers refer to obsolete standards ; Some gas-fired organic heat carrier boilers do not have a quality plan for their manufacturing, and the documentation provided at delivery is missing items such as medium flow diagrams. V. Quality Inspection and Testing Center for Hydraulic Metal Structures of the Ministry of Water Resources. Some type test reports are signed by only one person. If there are missing or omitted items in the test plan, the stress testing items lack the content related to stress testing under load at the extreme end positions. For the noise testing items, background noise was not recorded in any case, and only one measurement was taken ; The judgment regarding the extreme position of the lifting device is incorrect; it should be considered unqualified ; The two type test reports of different models of general-purpose bridge cranes sampled were for the same prototype ; The original record should include all the items of the raw data; however, no raw test data was entered, only qualitative results were provided. The original test records did not include information such as the test instruments and equipment used. VI. Quality Inspection Institute for Instruments and Components in the Machinery Industry (**Quality Supervision and Inspection Center for Instruments and Components). None of the type test samples were collected on-site at the manufacturing unit, and the sampling base did not meet the specified requirements ; For some pipe fittings and expansion joint test reports, a burst test on 2 samples is required, but only 1 sample was tested in each case ; In some reports, the calculation of the blasting test pressure was incorrect, resulting in calculated blasting pressures that were lower than the specified values. VII. Wuhan Port Machinery Quality Supervision, Inspection and Testing Center. Some reports and records lack test or inspection records for items such as insulation tests, the vertical displacement of the lifting device during amplitude changes, lifting height/dropping depth, maximum/minimum amplitude, and the function of the torque limiter. The test records do not contain a description of the main structural configuration, although such information is present in the reports. In some test reports and records, the functional and error tests for safety protection devices and lifting torque limiters were not carried out as required; the load tests did not meet the requirements of type testing. The original records did not include information on background noise. For parameters such as lifting speed deviation, lowering speed deviation, rotation speed, insulation testing, and braking slip deviation, the original test data and corresponding times were not recorded. Additionally, the functional tests for load capacity limiters were not conducted as specified, or the test results section in the original records lacked actual measurement data. VIII. Chengdu Chemical Pressure Vessel Inspection Station. The approved RD3 project is short of 1 pressure vessel inspector ; The approved RD3 and DD3 projects are missing 1 gamma ray machine ; The Detailed Rules for Periodic Inspection of Fixed Pressure Vessels were not revised in accordance with the Safety Technical Supervision Regulations for Fixed Pressure Vessels ; The general procedures for inspections such as radiography, ultrasonic testing, magnetic particle testing, and penetrant testing have not been revised in accordance with NB/T47013-2015 ; No management review was conducted ; Digital ultrasonic flaw detectors, Rockwell hardness testers, digital oxygen meters, etc. have not been calibrated or verified. Inspections were not carried out in strict accordance with the requirements of safety technical specifications; for example, during regular inspections of pressure vessels, thickness measurements were not taken at the areas where pipes are connected, and there were no original records for the pressure testing procedures ; During the regular inspection of pressure pipelines, when there are no original completion documents, the material composition of the pipelines is not verified, nor are any random checks conducted on any buried defects in the pipelines. IX. Hebei Special Equipment Supervision and Inspection Institute. Some reports and records lack the entry for high-strength bolt assemblies, and the test results for the synchronization speed of various working mechanisms are not provided. During the inspection of the safety monitoring and management system for large-scale lifting equipment, the comprehensive error factor related to the lifting capacity was not tested as required, and no data was recorded ; The load test included items regarding allowable speed deviations, and the original measurement data was not recorded as required by the operation instructions. For the type test documentation with number QX20170001, on-site testing did not provide conditions for full-stroke lifting and gantry movement tests, but test data for relevant items were provided. X. Zhejiang Province Pump and Valve Product Quality Inspection Center. For some type tests, since the valve diameter exceeds the testing capabilities of this facility, the actual testing is carried out at the site of the applying party ; There are discrepancies in timing for aspects such as sampling for partial type test reports, design review, sample inspection, and pressure-testing for opening and closing. The scope covered by some type test certificates does not fully correspond to the requirements specified in the safety technical specifications. XI. Guangdong Asia-Pacific Theo Elevator Co., Ltd. There is a lack of professional technical personnel, resulting in serious problems in resource maintenance ; The list of qualified suppliers is incomplete; no evaluation has been conducted on qualified suppliers such as Haolaoao Machinery (Shanghai) Co., Ltd ; Standards and specifications were not updated in a timely manner as required by the system documents ; No records of inspection upon receipt of escalator components were found ; The workshop does not have designated areas for items awaiting inspection, qualified products, or defective products ; The speed limiter tester was not calibrated on time, and no calibration certificate was available ; No records of the control cabinet’s voltage withstanding test are available ; No evidence of corrective actions taken regarding the issues identified in the most recent review was found ; The validity period of the Manufacturing License is not indicated on the product packaging or the product certificate ; The control cabinet assembly workshop is equipped with anti-static measures. XII. Shandong Tianmai Pipe Industry Co., Ltd. Due to poor management, the company is facing severe operational difficulties and has ceased all activities; it is currently on holiday. The company’s production equipment, testing equipment, and inspection equipment are under maintenance. Although the factory buildings and office facilities are in good condition, the company does not have the capacity to produce anything at present. 13. Shandong Tianhai High-Pressure Vessels Co., Ltd. The number of non-destructive testing personnel does not meet the requirements ; The pipes are not managed by separating them into qualified and unqualified categories, and the first-level and second-level storage areas for welding materials are not designated separately ; Welding-free laboratory ; The dedicated area for airtightness testing lacks safety protection measures ; Lack of non-destructive testing equipment ; Lack of test methods and acceptance criteria for compressive and bending tests of purchased bottle valves ; The person responsible for welding did not sign to confirm the welding procedure ; The person responsible for the pressure test did not sign to confirm the records of the hydrostatic test and airtightness test ; The pressure gauge used for the hydrostatic test is not within its valid calibration period ; Some small-volume steel seamless gas cylinders were not subjected to bottom scraping, bottom airtightness testing, and internal cleaning on a per-cylinder basis as required ; No commission order for non-destructive testing of some liquefied petroleum gas cylinders ; For some LPG cylinder products, there are no signatures of the person who conducted the hydrodynamic explosion tests on their mechanical properties, and the test data has been altered arbitrarily. 14. Suzhou Fenhu Elevator Technology Co., Ltd. Escalator suppliers are not listed in the directory of qualified suppliers available for review ; The investigation and evaluation records of the safety protection device supplier did not include the supplier’s administrative license number or the scope of the license ; The “List of Controlled Documents” and “List of Major Regulatory, Safety, Technical Specifications and Standards” provided for review do not include Amendment 1 to GB7588 ; The escalator assembly procedure documents provided on site were not included in the “List of Controlled Documents,” and there was no control mark on them ; Some internal auditors did not sign the corresponding inspection records ; During the incoming inspection of the speed limiter, the operating speed of the limiter was not checked in accordance with the requirements specified in the inspection records, yet the corresponding item was deemed qualified ; The factory certification sheets for some traction passenger elevators do not specify the model and manufacturer information of the door locking device ; The provided \"Customer Satisfaction Survey Form\" does not contain any records of the survey process ; The factory certification sheets for some traction passenger elevators do not indicate the expiration date of the manufacturing license. 15. Guangzhou Juyi Steel Pipe Manufacturing Co., Ltd. No welding professionals available ; The number of certified welders does not meet the requirements ; The responsible personnel for the quality assurance system were not appointed in a timely manner after there was a change ; The persons responsible for preparing, reviewing, and approving the process validation report do not match those assigned for these tasks ; The signatories of the physical and chemical testing reports, non-destructive testing reports, and quality certification documents for corrosion-resistant pipeline components are not personnel responsible for the quality management system. CC: China Special Equipment Safety and Energy Conservation Promotion Association, China Special Equipment Inspection Association