Calculation of the top of the solid material silo

2018-02-06View Original

Thread Content

I seek guidance from experienced experts: In NB/T 47003.2-2009, in equation (50) for the calculation of the silo roof shell, what does 1.mt1 represent – the mass per unit area of the silo roof shell? Does this unit area refer to the surface area of the conical silo roof or its vertical projection area? 2. What does the additional mass referred to by mt2 mean? What does MT3 refer to, the average load? 3. In Section 6.11.3, equation (57), what does the concentrated load Wz refer to? 4. Are the loads associated with roof maintenance, platforms, and pipelines calculated under mt2, mt3, or Wz?
Reply #22018-02-06
Uniform loads such as snow load, whereas attached loads are eccentric or concentrated loads
Reply #32018-02-06
In the formulas here, the uniformly distributed load is not considered as snow load.
Reply #42018-07-14
I need an answer; the calculation examples in the standards don’t include any calculations related to pouring the liquid, only stating that verification should be carried out in accordance with relevant standards!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.