Thread Content
I would like to ask everyone: in chemical manufacturing enterprises, after applying fireproof coating to the steel structures of utility tunnels, is it necessary to submit the work to the local fire department for inspection and approval? If necessary, which standards require it? Thank you!
“According to Order No. 106 of the Ministry of Public Security, the \"Regulations on Fire Supervision and Management of Construction Projects,\" factories that produce, store, or handle flammable and explosive hazardous materials are required to apply to the fire protection agencies of the public security organs for fire design approval, and to apply to those same agencies for fire safety inspection once the construction project is completed”
This post was last edited by Reaching for the Moon in Nine Heavens on 2018-3-16 at 15:32. According to Ministry of Public Security Order No. 106, the \"Regulations on Fire Safety Supervision and Management of Construction Projects\", the documents required when applying for fire safety inspection include: ① Application form for fire safety inspection of construction projects; ② Report on the completion inspection of the project; ③Certification documents for the quality of fire protection products ; ④Certification documents showing that building components, building materials, and interior decoration materials with fire resistance requirements meet **standards or industry standards, as well as factory inspection certificates ; ⑤Certification documents confirming compliance with inspections for fire protection facilities and electrical fire prevention technologies ; ⑥Legal identification documents of construction, project supervision, and testing agencies ; Fireproof coatings for steel structure pipe corridors are considered fire protection facilities, and they require testing by a fire safety inspection agency. Once the testing is successful and a certificate of compliance is issued, such documents, along with the other mentioned materials, must be submitted to the fire department, which will then carry out the acceptance process